Long‑Term WFGD Performance at LCRA Fayette (2×600 MW)

LCRA confirms successful operation and ≥97% SO₂ removal for MET limestone WFGD at Fayette Units 1 & 2 since commissioning in 2011.

LCRA Fayette (2×600 MW) — Client Letter

LCRA confirms successful operation and ≥97% SO₂ removal for MET limestone WFGD at Fayette Units 1 & 2 since commissioning in 2011.

At the LCRA Fayette Power Project in Texas, USA, MET engineered, designed, and supplied two limestone Wet FGD systems for Units 1 & 2 (2×600 MW), with field start‑up oversight. The WFGDs have been operating successfully since 2011, achieving ≥97% SO₂ removal.

Highlights

MET has proven itself to be a reliable, responsive, and diligent supplier… The Wet FGD units have been operating successfully since they were commissioned in 2011, consistently meeting the established SO₂ removal reduction requirements.